Ministry of Housing visits

Ministry of Housing visits Al Kobaisi Building System Factory participated by the heads and chiefs of different Directorate. The assembly was held at Al Kobaisi Group main office hall at Hidd Industrial Area on August 28, 2014 at 10:00 am opened by Mr. Farooqahmed, Factory Manager (Precast & Building System division). The program ran with the view of our previous prestigious projects along with the major partners who facilitated the operation of Al Kobaisi Building Systems. Mr. Farooq underlined the vision of KBS as a reliable and complete building solutions for Kingdom of Bahrain along with the mission of total customer satisfaction. The presentation broke the eye of the audience as Mr. Abdulla Al Kobaisi, Managing Director barely mentioned the existing housing situations of the community, along the way, MoH’s keenness triggered out as the solution presented on the shape of Kobaisi Building System. Through this system, we could achieve the highest quality, cut costs, less material wastage, time saving, less manpower and environment friendly. Firstly introduced in the Kingdom of Bahrain to make the construction easier than the traditional way.

The presentation continues with the stages of the building system stringently explained by the brain of the system, Mr. Abdullah Al Kobaisi. Questions were raised laterally during the presentation and out of the perfect design from German technology, audience left amazed with the initiative implemented by Mr. Al Kobaisi to provide solution in current housing crisis.

The program then stretched out with the visit in the factory spearheaded by Mr. Al Kobaisi. The tour led them to witness the state-of- the-start technology, which kept their senses in a vision to lead the way ahead.

Finally, the audience expressed honor to the system and left the factory with full hope of solving the increasing number of housing application in the Kingdom. “…I feel this is the opportunity and a good Media to introduce this system”. Mr. Ameer Affooni, Head of Construction Projects stressed on during the presentation.

Ramadhan Kit distribution

Al Kobaisi Group gives away the Ramadhan Kit prior to enter the holy month of Ramadhan. It has been the practice of Mr. Abdulla Al Kobaisi, Managing Director to distribute grocery items for the employees in preparation of Ramadhan. Along with the kit is his warmth greetings of Ramadhan Mubarak extended to every family of his employees.

Ministry of Work visit

Ministry of Works visits Al Kobaisi Building System factory participated by Construction Project Directorate (CPD), Material Engineering Directorate (MED), Building Maintenance Directorate (BMD) and Special Projects Directorate (SPD). The gathering was held at Al Kobaisi Group main office hall on June 25, 2014 at 9:00 am opened by Mr. Essa Al Kobaisi, General Manager (Car Rental & Maintenance Center). Mr. Farooq Ahmed, Factory Manager (Precast & Building System) pave the way to unfold the latest technology of Kobaisi Building System. Along the presentation, Mr. Farooq highlighted the visions and aspirations of Al Kobaisi Group as to adhere objective of Bahrain Government of affordable housing shaped in this Building System. Through this system, we could achieve the highest quality, cut costs, less material wastage, time saving, less manpower and environment friendly.

The presentation continues with some questions raised and barely responded by Mr. Abdulla Al Kobaisi, Managing Director. As the brain of the system, he attained patent of the first Building System designed with German technology and made to change from the traditional methods of construction to the industrial pre-fabrication of block-walls.

Videos of recent projects were presented along with other unique construction products such as Geoplast & PU 700. Geoplast replaces the wood shuttering into ABS plastic made formworks, light-weight and fast to install. PU 700 made the first alternative to traditional mortar with rapid curing, easy to apply, no mixing required, no mess and no waste being left in construction site. These products combined with Building System makes construction fast and simple.

The visitors are then taken to factory to witness the production made in Kobaisi Building System spearheaded by the brain of the system, Mr. Al Kobaisi. The visit went with an actual presentation of how the machine moves fast to another station, with consistent monitoring of quality in every stage. The tour lasts for 30 minutes and the audience left stunned how Mr. Al Kobaisi done his initiative to help solve the housing situation of Bahrain community.

Mr. Al Kobaisi took the stage and ended up the program with words of wisdom. “In engineering field, actual experience weighs more than theory”.